Initially I had only planned to do the facade work myself but as the contractors kept eating away my budget the work that I had to do grew a lot. And after witnessing the quality of the work, I realised I could do it myself with a little more attention and care. I was inexperienced but was able to learn on the go of course making some mistakes and redoing some stuff.
Kitchen and Bathroom walls:
The first thing that I started was the service cavity work for the kitchen and bathrooms.
In Sweden there are organisations that research and publish standards on how a particular construction is to be carried out. Sakervatten is one such organisation that deals with all wet room construction details. I had planned to follow those guidelines. There were some small changes done by my architect who…